
Planet Fitness
At D9 Flooring, we were proud to support the renovation of Planet Fitness with a full scope of services that included demolition work, new tile installation, and post-construction cleaning. Our team specializes in delivering fast, clean, and precise results—exactly what high-traffic commercial facilities like Planet Fitness require.
Duration: one month
Locations: Bellevue, WA / Federal Way, WA / Bremerton, WA
Services provided on this project

Professional Demolition
We safely removed existing materials, fixtures, and damaged surfaces to prepare the space for upgrades. Our crew handled all interior demolition with efficiency, dust control, and compliance with safety standards—ensuring the jobsite stayed clean and ready for the next phase.

High-Quality Tile Installation
Planet Fitness needed durable, long-lasting surfaces able to withstand heavy daily use. D9 Flooring installed new commercial-grade tile with perfect alignment, clean cuts, and strong long-term performance. From restrooms to high-moisture areas, every detail was completed with precision and backed by our workmanship warranty.

Final Cleaning
Once installation was complete, our cleaning team delivered a full final clean—removing debris, dust, grout haze, and construction residue. The result: a spotless, move-in-ready environment prepared for opening day.

























